HIGH SPEED/HIGH CAPACITY RAILWAY LINES: MILAN-BOLOGNA (CEPAV1: 230 KM) AND MILAN-VERONA (CEPAV2: 125 KM) – ITALY

COMMITMENT: Snam Progetti S.p.A. – ENI Group – San Donato Milanese - Italy

DATE: 2004–2005-2006-2009-2010-2012

PROJECT VALUE: € 4,9 billions for line Milan-Bologna; € 1,5 billions for line Milan-Verona

TYPE OF WORK: Basic and Final Design; consultancy and supervision activity during the construction.

 

DESCRIPTION OF THE ACTIVITIES AND RESPONSIBILITY:

Basic and Final Design of the Milan-Verona High Speed/High Capacity Railway Line (CEPAV2):

  • design of the railway marshalling yards inside the storage areas to support the construction of the line; sizing of the areas to store the railway materials (rails, sleepers, ballast, etc.)
  • definition of the railway layout inside storage areas
  • basic design of the tracks linking the areas with the existing railway lines and of the tracks inside the storage areas of Treviglio, Ospidaletto, Montirone, Rezzato, Gardesana, Lugagnano
  • equipment/material quantities estimation and investment costs estimation
  • preliminary activity to solve the interferences between the new line and the existing railway lines, which can create delays and/or interruptions of the existing services (railway junctions, road access, tunnels, causeways, etc.); identification of the interference and technical schedule of the solution.

 

Final Design and construction of the Milan-Bologna High Speed/High Capacity Railway Line (CEPAV1):

  • consultancy and supervision activity
  • verification of the final design for what concerning data coming from the installed control units (UAD) regarding the civil infrastructures on the Melegnano-Fidenza section (50 km).

 

HIGH SPEED/HIGH CAPACITY RAILWAY LINES: MILAN-BOLOGNA (CEPAV1: 230 KM) AND MILAN-VERONA (CEPAV2: 125 KM) – ITALY